• <button id="4spwl"></button>
  • <button id="4spwl"></button><em id="4spwl"></em>

    1. <button id="4spwl"></button>
      <rp id="4spwl"></rp>

      RETURN

      PERFO

      Tailings Pond of Dahutang North Tungsten Mine, Wuning, Jiangxi

       

      The dam of tailings pond is constructed by means of ?lling against the center line. Maximum heigh of dam: l98m.

      Final effective storage: about l88,700,000m³.

       

      2019天天看夜夜看狠狠看噜片_无码专区狠狠躁天天躁_台湾中文娱乐综合she天天_夜夜爽狠狠天天婷婷五月